Refurbishment Work To School After Significant Flooding
During the bank holiday weekend of the summer holiday period in 2014, Queen Elizabeth Girls School where we regularly carry out works suffered flooding in some of their buildings.. The flood occurred as debris had found its way from flat roof areas into the rainwater discharge system and had caused a physical blockage under the ground. [...]