The challenge
Daily Fish Supplies is a high-quality fish supplier based in central London and serving a range of clients including top hotels and restaurants.
Because of expanding orders Daily Fish needed more office space and bigger production and cold-store areas which was to be achieved using mezzanine floors and wall partitioning. The company already occupied four adjacent industrial units which had been fitted out by Adept and the opportunity arose to obtain a fifth in the row.
The project
Adept Building Services were commissioned with a cold-store builder to deliver the complete turnkey package of the additional facility linking with the existing units.
The project began with stripping out the 250-square metre unit which had been used as a distribution trade counter for heating and plumbing goods.
A mezzanine floor was then installed and all aspects of the project completed including partitioning, fireproofing between levels, ceilings, resin floors, steel security doors and shutters, decoration and installation of kitchen and wash room facilities.
The result
The new facility with its newly fitted mezzanine floor and wall partitioning that has enabled Daily Fish to take full advantage of expanding demand through the provision of extra production and cold-store areas designed and built to the highest standards and totally in line with requirements. The staff who work at the company now enjoy a modern and comfortable office environment.